Will Modulink connect to your equipment?
Match existing instruments, soil sensors and control equipment to Indi or Agri before you select hardware. Both connect to an on-site Base Station for readings, history, alerts and application Skills.
Compatibility depends on the exact instrument, wiring, power, output load and site network. Have engineering confirm the selected configuration before installation.
Start with the signal and the task
For an RO skid, CIP process or pump installation, identify the instruments that produce pressure, flow, temperature or other readings. Indi receives supported electrical signals from those instruments; it does not measure each process variable without a suitable sensor. For a field zone, Agri connects supported soil sensors and compatible latching valves.
- Indi Wi-Fi: inputs, control and power
- Indi LoRa: inputs, control and power
- Agri: inputs, control and power
Have an existing PLC or SCADA system? Indi supports shunt-mode analog-input integration with existing systems, subject to wiring review. Do not assume that adding a terminal leaves every existing loop unaffected. Request the selected product’s wiring documentation and confirm the loop-power and reference arrangement.
Indi Wi-Fi connection requirements
- Measurements
- Two independently wired 4–20 mA input channels. Each channel supports inline current-loop or endpoint / ground-referenced wiring.
- Control
- One H-bridge motor/actuator interface with output-current sensing and programmable current-reference control. Confirm the actuator and load with engineering.
- Power and connection
- 12–24 VDC line power and site Wi-Fi to the shared on-site Base Station.
- Bring to the review
- Instrument and actuator model numbers, loop wiring, existing PLC/SCADA connections, supply details and Wi-Fi coverage.
Indi LoRa connection requirements
- Measurements
- Two independently wired passive 4–20 mA inputs and two ground-referenced 0–10 V inputs.
- Control
- One output selectable as a 4–20 mA current source or a 0–10 V voltage output; an external relay-driver interface. These interfaces require compatible external equipment.
- Power and connection
- Nominal 24 VDC line power and private LoRaWAN US915 to the shared on-site Base Station. The battery-powered Indi version is a future offering.
- Bring to the review
- Transmitter model numbers, loop-power arrangement, voltage references, output loads, site power and radio obstructions.
Agri connection requirements
- Measurements
- Up to three Irrometer Watermark 200SS soil-water-tension sensors and a DS18B20 soil-temperature interface. Tension readings describe soil-water availability; they are not a universal volumetric-water-content or salinity measurement.
- Control
- Open/close pulses for compatible DC latching irrigation valves. Confirm the solenoid model and drive requirements; this is not a direct mains-powered pump starter.
- Power and connection
- Nominal 6 V from four C alkaline cells; conservative battery-life claim of over one year. Private LoRaWAN US915 to the shared on-site Base Station.
- Bring to the review
- Crop and zones, sensor depths and locations, valve/solenoid model, radio obstructions and maintenance access. Sensors, batteries and valves are separate accessories.
The Base Station, site network and remote access
A terminal is one part of the installation. The shared Modulink Base Station runs the on-site software, dashboards and Skills, and stores received readings and application records at your site. Choose its location and verify Wi-Fi or LoRa coverage before commissioning.
Local operation does not require a vendor cloud or product phone-home. Off-site access still needs a secure network arrangement managed for your site. Weather feeds, external integrations, off-site notifications and remote support need their respective connections. Loss of internet is different from loss of terminal power or radio coverage: on-site storage does not establish that every missing reading can be recovered.
Platform interfaces include MQTT, REST and Prometheus, with Modbus TCP at the Base Station. This does not establish direct RS-485 or Modbus connectivity on every terminal, or compatibility with every third-party LoRaWAN gateway. Confirm the required integration.
Separate a command from a measured result
A valve command or motor-interface current is not independent proof of valve position, pump operation or water flow. If your decision requires measured flow or pressure, specify suitable instruments and confirm their Indi interfaces. Keep equipment protections and control requirements in the engineering review.
Use the RO/CIP monitoring guide for process records, or the irrigation guide for soil trends, compatible valves and Irrigation Intelligence. Modulink does not replace every treatment analyzer, PLC or farm control system.
Confirm what is included and what is separate
- Modulink Base Station
- $1,000 USD each
- Modulink Agri
- $500 USD each
- Modulink Indi LoRa
- $500 USD each
- Modulink Indi Wi-Fi
- $500 USD each
Engineering assistance is $200 USD per hour. The general system estimate separates terminals, Base Station, Skills and engineering services. Sensors, power supplies, batteries, valves, external relays, mounting and installation materials must be scoped separately. Application Skills and installation assistance depend on the selected package and quote.
Build a general system estimate, or review the defined Indi LoRa and Agri pilot packages with their own inclusions, exclusions and renewal terms.
For a useful fit review, send the equipment model numbers, signal and wiring details, power, site layout, measurements and controls needed, and who will install and administer the system. Engineering must confirm electrical limits, radio coverage and integration scope; this guide supplies no unverified accuracy, load, range or enclosure rating.
Plan commissioning and acceptance checksTalk through your application
Tell us about your equipment and the decisions you need to make. Our engineering team will help you choose a system.